$33.8 million of the 2020 bond was approved to improve accessibility when entering schools from the parking lot and bus drop-off areas as well as from the hallways to classrooms, cafeterias, gyms and other essential areas. This could include:
- Parking lot striping for accessible stalls
- Accessible walkways and entryways
- ADA door operators at accessible entries
- Handrails at ramps and stairs
- Ramp construction
- Restroom renovations
- Replacing sinks with accessible sinks
- Assistive listening device installation
- Installation of lifts at theater stages
- Installation of accessible door hardware
Work was completed at all schools, except those that were recently modernized.